Tentative Work Schedule

December 19, 2018

 

Work in the NE section consists of Grading NE 247th and Grading NE 219th with the Road Boss

 

Work in the NW section consists of Grading NW 203rd St., NW 44th Ave., NW 44th Ave., and Grading NW 38th Ave., NW 42nd Ave. and NW 219th with the Road Boss, Mowing NW 25th Ave., 238th St. NW 241st Ter. and NW 63rd Ave. with the Side Arm Mower, Blowing out culverts at 6596 NW CR 229A and on NW CR 233 and Digging the ditches around 3901 NW CR 233

 

Work in the SE section consists of Grading SE 49th Ave. and Patching pot holes on SE 50th St. and SE 16th Ave.

 

Work in the SW section consists of Patching pot holes on SW CR 235

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be Patching pot holes at 2970 SE 50th St., 16515 SW CR 235 and 5444 SE 16th Ave.

 

1 Squad will be Picking up trash and weed eating on SW CR 18 starting on SW CR 227 and going towards Brooker

 