Work Schedule

 

Work in  the NE section consists of Patching pot holes

 

Work in the NW section consists of Grading and Cutting, Trimming and Chipping

 

Work in the SE section consists of Milling part of a road and Grading

 

Work in the SW section consists of Grading, Grading milled roads, Digging ditches and Weed eating, edge sidewalks and Trimming

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad will assist in Weed eating, Trimming and Edge in the SW section

 

1 Squad will assist with Trimming, Cutting and Chipping in the NW section

 

1 Squad will assist with traffic in the SW section

 

 

1 Squad from The Transition House (3 people) will assist in patching pot holes in the NE section