Tentative Work Schedule

January 5, 2021

 

Work in the NE section consists of Grading NE 173rd St. and NE 12th Ave. and Patching a driveway on NE CR 200B

 

Work in the NW section consists of Mowing ROW on NW 180th St.

 

Work in the SE section consists of Grading SE 46th Loop, Prepping SE 66th St. and Patching a driveway on SE 11th Ave.

 

 

We did not receive any DOC Squads today