Tentative Work Schedule

November 10, 2020

 

Work in the NE section consists of Grading NE 204th St.

 

Work in the NW section consists of Grading NW 198th St., Cleaning up tree debris at NW CR 229 and NW 71st and NW CR 125 and Mowing NW CR 233, NW 216th and NW CR 200A

 

Work in the SE section consists of Grading SE 11th Ave. and SE 56th, Picking up and Chipping tree debris on SE CR 21B and SE 43rd St. and SE 66th and Mow SE 144th St.

 

 

We received 2 DOC Squads for a total of 7 people

 

1 Squad will be Chipping on SE CR 21B

 

1 Squad will be Patching Pot Holes on NW 84th Ave. and NE 204th St. from RR tracks to "T"