Tentative Work Schedule

April 18, 2023

 

Work in the NE section consists of Cleaning out Ditches on NE 21st Ave. and Mowing sidewalks on NE 17th Ave. with Zero Turns

 

Work in the NW section consists Grading NW 212th St., NW 219th St. and NW 205th St. and Mowing NW 36th Ave. and NW NW 37th Lane

 

Work in the SE section consists of Grading SE 46th Loop, SE 1st Ave. and SE 31st St., Mowing SE CR 18, Hampton Ball Park and SE 81st St. and Mowing Sidewalks on SE 8th Ave. with the Zero Turns

 

Work in the SW section consists of Grading SW 132nd Ave., SW 130th Pl. and SW 127th Ave.