Work Schedule

 

Work in the NE section consists of patching pot holes

 

Work in the NW section consists of Zipping, Pulling ditches, Ditch work and Cut & trim ROW

 

Work in the SE section consists of Grading, Mow and Cut and trim ROW

 

Work in the SW section consists of Patching driveway

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be assisting in Cutting & Trimming ROW in the NW section

 

1 Squad will be assisting with Traffic Control in the NW section

 

 

1 Squad from The Transition House ( 3 people) assisting in Patching a driveway in SW section and pot holes in SE section