Tentative Work Schedule

September 29, 2021

 

Work in the NE section consists of Grading NE 20th Lane and Paul Lane and Replacing the Crossover pipes on NE 17th Ave.

 

Work in the NW section consists of Grading NW 178th Loop

 

Work in the SE section consists of Grading SE 46th Loop, SE 1st Ave. and SE 31st and Mowing SE CR 18, SE CR 221 and SE CR 325

 

Work in the SW section consists of Grading SW 92nd St. and SW 106th Ave., Mowing SW CR 18,  SW 209th and SW 206th, Mowing ROW on SW 160th Ave. and Picking up Dead Deer on SW CR 227

 

We will also be Mowing around all Fire Department Stations with the Zero Turn Mowers

 

 

We received 2 DOC (BCSO-JAIL) Officers and a total of 5 inmates

 

1 Squad with 2 Inmates will be assisting with Replacing the Crossover pipes on NE 17th Ave.

 

1 Squad with 3 Inmates will be Picking up trash on SE 21st Ave. and Weed Eating on SE 139th