Work Schedule

 

 

Work in the NW section consists of Milling, Grading & Repair, Patching driveways, Chipping limbs, Patching driveways and Mowing

 

Work in the SE section consists of Patching driveways

 

Work in the SW section consists of Milling & Repairing an road and  Patching Guradrails on a bridge

 

 

We received 2 DOC Squads for a total of 11 people

 

1 Squad will assist with Chipping limbs in the NW section

 

1 Squad will be picking up trash and weed eating in the NW section

 

 

1 Squad from The Transition House (2 people) will be Repairing guardrails on a bridge in the SW section and Patching driveways in the NW & SE section