Work Schedule

 

Work in the NW section consists of Pulling ditches & Milling, Grading, Chipping debris and Patching driveways and pot holes

 

Work in the SE section consists of Installing culverts

 

Work in the SW section consists of Grading

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Chipping debris in the NW

 

1 Squad will be performing traffic control for installation of culverts

 

1 Squad will be picking up trash and weed eating in NW

 

 

1 Squad from The Transition House (1 person) will be patching pot holes and driveways