Tentative Work Schedule

September 23, 2019

 

Work in the NE section consists of Mowing NE 218th St.

 

Work in the NW section consists of Grading NW 62nd Ave. NW 177th & 71st and Mowing NW 41st Ave.

 

Work in the SE section consists of Grading SE 45th, SE 101st & SE 49th (Lewis Griffis), Mowing SE CR 18 and Digging ditches on SE 150th at the corner of SE CR 230A

 

Work in the SW section consists of Grading SW 66th, SW 104th & SW 106th, Patching troughs on SW CR 18 and Mowing SW CR 225 & SW CR 18

 

 

We received 3 DOC Squads for a total of 10 people

 

1 Squad will be Patching troughs on SW CR 18

 

1 Squad will be working to close the gate at 3 Pipes

 

1 Squad will be directing traffic control for digging the ditches at the corner of SE CR 230A on SE 150th