Tentative Work Schedule

September 22, 2020

 

Work in the NE section consists of Grading NE 173rd St. & Ne 5th Ave., Clean out ditch on NE 227th St. and Patch Pot Holes on NE 20th Lane, NE 17th Ave. & NE 17th Loop

 

Work in the NW section consists of Mowing NW CR 229, NW 177th St. & NW 180th St.

 

Work in the SE section consists of Mowing ROW on SE 87th St. & SE 9th Ave.

 

Work in the SW section consists of Grading SW 132nd Ave., Fog Sealing SW 106th Ave., Chipping limbs and Mowing  on SW CR 231 (Dedan Loop) and Moving limbs after being trimmed, out of the road on SW CR 18

 

 

We received 1 DOC Squads for a total of 5 people

 

1 Squad will be Chipping limbs on SW CR 231 (Dedan Loop)