Tentative Work Schedule

May 31, 2022

 

Work in the NW section consists of Grading NW 71st Pl., NW 203rd Ave. and NW 205th Ave., Repairing the Bridge on NW 74th Ave. and Mowing ROW on NW 75th Ave.

 

Work in the SE section consists of Grading SE 46th Loop, SE 1st St. and SE 52nd St. and Mow Lincoln City around Mailboxes, Signs and Culverts with Zero Turns

 

Work in the SW section consists of Grading SW 180th St. and SW 114th Ave., Mowing SW CR 18 and SW CR 231 (Dedan Loop) and Mowing around Mailboxes, Signs, Culverts and Guardrails on SW CR 100A with Zero Turns

 

 

We received 2 DOC (BCSO-JAIL) Officers and 5 Inmates and they will be assisting with the Bridge Repair on NW 74th Ave.