Tentative Work Schedule

 

July 16, 2018

 

Work in the NW section consists of Pulling ditches on NW 71st Ave. and Dig ditches on NW CR 125

 

Work in the SE section consists of Adding Clay, water and Enzymes to SE 66th St. and Install culvert at 722B SW 66th St.

 

Work in the SW section consists of Patching pot holes and Mowing SW CR 235

 

 

We received 2 DOC Squads for a total of 11 people

 

1 Squad will be Patching  pot holes on SW CR 235

 

1 Squad will be Picking up trash and weed eating on NW CR 125 from NW CR 225A towards SR 16