Tentative Work Schedule

February 2, 2022

 

Work in the NE section consists of Cleaning out a ditch on NE 19th Lane

 

Work in the NW section consists of Grading NW 53rd, NW 219th and NW 71st St.

 

Work in the SE section consists of Grading SE 16th Ave. and roads in Crystal Lake Homesites and Picking Up Trash

 

Work in the SW section consists of Grading SW147th and SW 111th St. (Louis Donato Road), Scooping out the Concrete Ditch at SW CR 231 (Dedan Loop) and SW 113th and Repairing the Bridge at SW CR 231 (Dedan Loop) 

 

 

We received 1 DOC (BCSO-JAIL) Officer and total 4 Inmates and will be assisting with Bridge Repair on SW CR 231 (Dedan Loop)