Tentative Work Schedule

 

 

August 8, 2018

 

Work in the NE section consists of Grading milled roads

 

Work in the NW section consists of Limerocking NW 77th Pl., Grading milled roads, Digging out ditches on NW 55th Ln.

 

Work in the SE section consists of Taking birms off of driveways on SE 66th St.

 

Work in the SW section consists of Grading SW 132nd Ave. and Installing a Crossover pipe on SW 132nd Ave., Repair road and Pull ditches on SW 155th Ave. and Mow on SW CR 18 

 

 

We received 3  DOC Squads for a total of 16 Ppeople

 

1 Squad will be assisting with Traffic Control and leveling our birms on driveways on SE 66th St

 

1 Squad will be Picking up trash and weed eating on SW CR 18 from Brooker toward 301

 

1 Squad will be Assisting with Traffic Control & clean up on SW CR 18 then weed eating at the Market Road pit