Tentative Work Schedule

October 20, 2020

Work in the NW section consists of Chipping and Mulching on NW CR 235, Cutting and Trimming limbs on NW CR 229 and NW CR 225 and Mowing ROW on NW 53rd Ave. and NW 219th St.

 

Work in the SE section consists of Mowing SE CR 18, SE CR 325, SE CR 18A and SE 9th and Cleaning out the ditch on SE 49th Ave. North of SE 109th (Meng Dairy)

 

Work in the SW section consists of Grading SW 155th Ave., SW 136th St. and SW 162nd Ter. and Spraying SW 106th Ave.

 

 

We received 2 DOC Squads for a total of 8 people

 

Both Squads will be assisting with Chipping on NW CR 235