Tentative Work Schedule

March 23, 2023

 

Work in the NW section consists of Grading NW 45th Ave. and NW 37th Ave. and Mow NW CR 229

 

Work in the SE section consists of Grading SE 46th, SE 86th and SE 61st and Fix a Driveway SE 11th Ave.

 

Work in the SW section consists of Grading SW 106th Ave.