Tentative Work Schedule

October 22, 2018

 

Work in the NW section consists of Grading NW 41st Ave., Pulling ditches on NW 75th Ave., Scooping ditches on NW 84th Ave., Mowing ROW on NW 61st Ave.

 

Work in the SE section consists of Patching pot holes on SW CR 18A and Trimming trees on SE 8th Ave., SE 16th Way, SE 16th St. & SE 5th St.

 

Work ion the SW section consists of Mowing ROW on SW 101st Ave.

 

 

We received 3 DOC Squads for a total of people

 

1 Squad will be Patching pot holes on SE CR 18A and then placing Concrete bags on a culvert on NW 214th St.

 

1 Squad will be Trimming Trees on SE 8th Ave. off of SR 100 and then SE 16th Way, SE 16th St. & SE 5th St.

 

1 Squad will be Scooping the ditches on NW 84th Ave.