Tentative Work Schedule

January 23, 2019

 

Work in the  NE section consists of Adding limerock to NE 204th St. and Dig Ditches on NE 15th Ave. and NE 17th Ave.

 

Work in the NW section consists of Trimming limbs on NW 38th Ave,

 

Work in the SE section consists of Patching pot holes on SE CR 214 and Grading off of SE 21st Ave.

 

Work in the SW section consists of Grading SW 106th Ave., SW 104th Ave. and SW 101st Ave. with the Road Boss

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be Picking up trash and Weed eating SE 44th Ave. and SE 2nd Ave.

 

1 Squad will be Patching pot holes on SE CR 214

 

1 Squad will be directing traffic for digging ditches on NE 15th Ave. & NE 17th Ave.

 