Sept. 5, 2018

 

Work in the NE section consists of Mowing NE 17th Ave. and Push up material for City of Starke at NE 19th Ave. site

 

Work in the NW section consists of Building up & Limerocking NW 105th, Replace crossover pipe on NW 71st, Pull ditches on NW 74th Ave., Scoop ditch on NW 53rd Ave. and Trim trees and limbs on Market Road from SR 16 to 301

 

Work in the SE section consists of Mowing SE 21st Ave. and roads off it and Patching pot holes on SE 35th

 

Work in the SW section consists of Grading SW 163rd

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be patching pot holes on SE 35th

 

1 Squad will be Picking up trash on NE 185th, NW CR 225

 