Tentative Work Schedule

July 11, 2019

 

Work in the NE section consists of Installing a culvert on NE 16th Ave and Digging out an outfall ditch on NE 227th St.

 

Work in the NW section consists of Grading NW 41st, NW 35th, NW 209th, NW 71st, NW 188th & NW 185th and Mowing NW 180th, NW 185th St., NW 84th Ave. & NW 188th St

 

Work in the SE section consists of Patching pot holes on SE 52nd St.

 

Work in the SW section consists of Grading SW 155th, SW 168th & SW 132nd Ave.

 

 

We received 2 DOC Squads for a total of 12 people

 

1 Squad will be Picking up trash on NE 19th Ave. & NE 173rd St.

 

1 Squad will be Picking up trash on NE 28th Ave. & NE 185th St.