Tentative Work Schedule

November 30, 2021

 

Work in the NE section consists of Cleaning out a ditch on NE 216th St.

 

Work in the NW section consists of Grading NW 74th Ave.

 

Work in the SE section consists of Grading SE 46th Loop and SW 31st

 

Work in the SW section consists of Grading SW 132nd Ave. (Moody Store Road), Repairing a Crossover pipe on SW 136th St. and Mowing ROW on SW 114th St. and SW 180th Ave.

 

We received 2 DOC Officers and a total of 2 Inmates

 

1 Squad with 1 Inmate will be assisting with Repairing a Crossover pipe on SW 136th St.

 

1 squad with 1 Inmate will be Picking up trash on SW CR 227 and SW CR 118