Tentative Work Schedule

July 24, 2019

 

Work in the NE section consists of Cleaning out the outfall ditch on NE 227th St. and Grade NE 247th, NE 6th Ave., NE 227th St. and NE 204th (Strawberry Acres) 

 

Work in the NW section consists of finishing the installation of culvert on NW CR 229 and Install culvert on NW 216th, Mow NW 61st Ave., NW 70th Ave., NW 219th Ter. and NW 216th and Grade NW 219th

 

Work in the SW section consists of Mowing SW CR 237, SW CR 100A and NW CR 229 and Grade SW 101st Ave.

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Weed eating all of SE 144th St. (Preacher Lee Road)

 

1 Squad will be Picking up trash on SW CR 235

 

1 Squad will be Weed eating NE 219th and NE 10th