Tentative Work Schedule

December 14, 2021

 

Work in the NE section consists of Grading NE 20th Lane, NE 219th St., NE 173rd, NE 19th and NE 12th (Down 301)

 

Work in the NW section consists of Grading NW 122nd, NW 124th, NW 198th, NW 205th & NW 178th Loop and Clean out a Ditch on NW CR 225A

 

Work in the SE section consists of Spraying SE 2nd Ave.

 

Work in the SW section consists of Mowing ROW in the SW area and Pouring Concrete around a culvert on SW 161st Ave.

 

 

We received 2 DOC (BCSO-JAIL) Officers and a total of 3 Inmates

 

Both Squads and all Inmates will be assisting with Pouring concrete around a culvert on SW 161st Ave.