Tentative Work Schedule

September 3, 2020

 

Work in the NW section consists of Cutting shoulders of the road on NW CR 225, Trimming ROW on NW 105th Ave. and Opening up the ditch on NW 71st Ave.

 

Work in the SE section consists of Grading SE 87th and Cleaning out concrete ditches on SE 4th Ave. and SE 5th Ave.

 

Work in the SW section consists of Mowing SW CR 237, SW CR 231 (Dedan Loop), SW CR 231 and SW CR 18

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be Weed eating on SE 49th Ave. behind Hampton Elem. School and then North of SE 109th on SE 49th Ave.

 

1 Squad will be Trimming brush at 1792 NE 154th St. then Weed eating on SE 35th