Tentative Work Schedule

July 17, 2023

 

Work in the NW section consists of Grading NW 74th Ave., NW 215th Way and NW 212th St.

 

Work in the SE section consists of Grading SE 71st, SE 72nd and SE 73rd, Mowing Shoulders on SE 57th St. and Mowing the Sidewalk on SE 8th Ave.

 

Work in the SW section consists of Grading SW 137th, SW 87th and SW 83rd, Adding Limerock to SW 136th St. and Mowing SW CR 237, SW CR 18 and SW CR 231