Tentative Work Schedule

March 9, 2021

 

Work in the NE section consists of Grading Carter Road

 

Work in the NW section consists of Grading NW 237th St. and NW 177th St., Fixing washout on NW 36th Ave., Cleaning out ditch on NW 62nd Ave. and Blowing out Culverts on NW 219th St. and NW 213th St.

 

Work in the SE section consists of Grading SE 52nd St.

 

Work in the SW section consists of Grading SW 101st and SW 85th Lane, Cleaning out the ditch on SW 194th Ave., Patching Pot Holes on SW CR 225A and SW CR 227, starting at 301 intersection and Mowing SW CR 18 and SW CR 231

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be Picking up trash and weed eating NW CR 225, starting at NW 180th

 

1 Squad will be assisting with Patching Pot Holes on SW CR 225A and on SW CR 227 starting at 301 intersection