Tentative Work Schedule

June 9, 2021

 

Work in the NE section consists of Mowing ROW on roads off of NE CR 200B

 

Work in the NW section consists of Grading NW 41st Ave. and NW 188th St., Prepping NW 61st Ave. and NW 200th St. for Spraying, Patching Driveways on NW CR 229 and Preparing pad at Market Road pit for delivery of Sandbag Canopy for Emergency Management.

 

Work in the SE section consists of Grading SE 49th Ave. and SE 43rd Ave.

 

Work in the SW section consists of Mowing SW CR 18 and SW CR 225A

 

Mow Ponds at the Pratt Street Library

 

 

We received 1 DOC Squad (BCSO-JAIL) with 4 Inmates and will be emptying sand bags at the Market Road pit.