Tentative Work Schedule

August 14, 2019

 

Work in the NE section consists of Grading and Packing NE 204th St. & NE 20th Lane and Grading NE 12th, NE 171st and NE 173rd

 

Work in the NW section consists of Installing a culvert on NW CR 225 and Mowing NW 177th St. & NW 62nd Ave. and NW CR 233 starting at 301

 

Work in the SE section consists of finishing covering the culvert on SE 129th St. and Installing a culvert on SE CR 230A, Mowing SE 11th, SE 74th and heading towards Brooker and Patching a washout at the intersection of 402 SE 73rd and SE 4th Ave.

 

Work in the SW section consists of Grading SW 101st Ave., Patching pot holes at 13084 SW 83rd Ave., 15519 SW 161st St. and 7455 SW CR 225 and Mowing SW CR 235, SW C 231 & SW CR 237 with the Zero Turn

 

We did not get any DOC inmates today