Tentative Work Schedule

March 7, 2020

 

Work in the NE section consists of Patching a Pot Hole at 15458 NE 17th Ave. and Mowing NE CR 200B

 

Work in the NW section consists of Mowing NW 216th St. and NW CR 200A

 

Work in the SE section consists of Grading SE 59th Ave.& SE 125th

 

Work in the SW section consists of Grading SW 114th St., SW 180th Ave, and SW 66th Ave. and Mowing around bridges on SW CR 18, SW CR 231 (Dedan Loop) and SW CR 225A

 

 

We did not receive any Inmates