Work Schedule

 

Work in the NE section consists of Grading

 

Work in the NW section consists of Milling a road, Grading and Chipping limbs

 

Work in the SE section consists of Grading

 

Work in the SW section consists of Grading, Milling a road, Ditch work and Patching a bridge

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be assisting in Chipping limbs in the NW

 

1 Squad will be picking up trash and weed eating in the NW

 

 

1 Squad from The Transition House (3 people) will be patching a bridge, pot holes and driveways