Tentative Work Schedule

December 23, 2020

 

Work in the NW section consists of Grading NW 188th, NW 193rd, NW 205th and NW 203rd and Patch Pot Holes on NW 177th St.

 

Work in the SE section consists of Performing ditch work on SE 140th Ave., Prepping SE 66th St. and Mowing ROW on SE 21st Ave.

 

Work in the SW section Grading SW 132nd Ave., Cutting up and Hauling off tree across road on SW 32nd Ave., Patching Pot Holes and troughs on SW CR 235 and Picking up trash on SW CR 18

 

 

BCSO Officer will be directing traffic for Patching Pot Holes and troughs on the side of the road on SW CR 235