Tentative Work Schedule

September 9, 2019

 

Work in the NE section consists of Patching pot holes on NE 26th Ave. and a driveway at 2545 NE 173rd 

 

Work in the NW section consists of Grading NW 219th St. and doing ditch work on NW 251st St. & NW 41st Ave.

 

Work in the SE section consists of Grading SE 46th Loop, SE 50th, SE 521st, SE 31st & SE 50th (off 21B by the lake) and Patching a drop off at Pineland Dr. and SE CR 18

 

Work in the SW section consists of Grading SW 101st Ave. and Mowing SW CR 235

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be Picking up trash and Weed eating NW CR 235

 

1 Squad will be Picking up trash and Weed eating SW CR 235

 

1 Squad will be assisting with traffic control and digging a ditch on NW 251st St.