Work in the NE section consists of Mowing the Sides of the Road on NE 219th St. and NE 10th Ave.

 

Work in the NW section consists of Grading NW 188th St. and NW 75th Ave. and Separating Rip Rap Rock from Dirt at the Market Road Pit

 

Work in the SE section  consists of Grading SE 51st Ave., Cleaning out Ditches and  Repairing the Erosion on SE 52nd St. and Mowing the Sidewalks on SE CR 21B and SE 8th Ave. with the Zero Turns

 

Work in the SW section consists of Grading SW 92nd St. and SW 101st Ave.

 

 

We received 1 DOC (BCSO-JAIL) Officer and Inmates and they will be Weed Eating the Ditches on NE 219th St. and NE 10th Ave.

 

1 DOC (BCSO-JAIL) Officer will be in Firearms Training