Work Schedule

 

Work in the NE section consists of Patching pot holes

 

Work in the NW section consists of Zipping a road, Pulling ditches and Cutting down a leaning tree

 

Work in the SE section consists of Installing culverts, Patching pot holes and Mowing

 

Work in the SW section consists of Patching pot holes and driveways and Cutting, Trimming and Chipping limbs

 

 

We received 2 DOC Squads for a total of 12 people.

 

! Squad will be assisting with Cutting, Trimming and Chipping in the NW & SW sections

 

1 Squad will be directing traffic for installing culverts

 

 

1 Squad from The Transition House (3 people) will be assisting with patching pot holes and driveways