Tentative Work Schedule

January 27, 2020

 

Work in the NE section consists of Building a Birm on NE 15th Pl., Patch a crossover pipe on NE 15th Ave. and Fill in part of a ditch on NE 20th Ln.

 

Work in the NW section consists of Grading NW 219th St.

 

Work in the SE section consists of Hauling dirt from Keystone Airport to Keystone pit

 

Work in the SW section consists of Prepping and Zipping SW 101st Ave.

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be directing traffic and assist with patching a Crossover pipe

 

1 Squad will be directing traffic and picking up tires on SW 101st Ave.