Tentative Work Schedule

November 20, 2019

 

Work in the NE section consists of Digging ditches in the area of NE 15th Ave. & NE 16th Ave.

 

Work in the NW section consists of Grading NW 219th St., Mowing NW 71st Ave., Patching driveway on NW CR 229A, Haul off dead tree on NW CR 235 and Build a pad for BCSO Car Wash

 

Work in the SE section consists of Grading SE 94th, SE 73rd, SE 72nd & SE 71st and Mow SE 49th Ave.

 

Work in the SW section consists of Hauling off dead tree on SW CR 235 and Mowing SW CR 231, SW CR 237, SW CR 18 and SW CR 231

 

 

We received 2 DOC Squads for a total of 11 people

 

1 Squad will be directing traffic and assisting with Patching a driveway on NW CR 229A and then hauling off dead trees on SW CR 235 and NW CR 235

 

1 Squad will be directing traffic and assisting with digging the ditch on NE 15th Ave. & NE 16th Ave.