Tentative Work Schedule

September 29, 2020

 

Work in the NE section consists of Grading NE 180th St. 

 

Work in the NW section consists of Grading NW 56th. Mowing NW CR 225A and NW CR 225 and Mowing ROW on NW 37th Ave. and NW 198th St.

 

Work in the SE section consists of Removing stump debris and filling in with milling on SE 5th Ave.

 

Work in the SW section consists of Grading SW 160th, SW 155th and SW 136th, Mowing SW CR 18 and keeping tree debris off of the road and Chipping limbs on SW CR 231

 

 

We received 2 DOC Squads for a total of 7 people.

 

Both Squads will be with the Chipping Crews chipping limbs