Tentative Work Schedule

November 16, 2020

 

Work in the NE section consists of Grading NE 12th Ave., NE 173rd St. and NE 171st St., Patching Pot Holes on NE 204th St. and Mowing NE CR 225, NE CR 125 and NE 216th

 

Work in the NW section consists of Prepping NW 124th St., Picking up trees on NW CR 233 and NW CR 125 and Mowing around culverts, signs, mailboxes and guardrails on NW 216th St.

 

Work in the SE section consists of Grading SE 46th Loop, Mowing ROW on SE 144th St. and Picking up tree debris on SW 66th St.

 

Work in the SW section consists of Picking up trees on SW CR 18

 

 

We received 3 DOC Squads for a total of 13 people

 

1 Squad will be Picking up trash and Weed Eating NW CR 229

 

1 Squad will be Mowing SE 49th Ave.  (Dirt Part)

 

1 Squad will be assisting with Patching Pot Holes on NE 204th St.