Tentative Work Schedule

September 5, 2023

 

Work in the NE section consists of Grading NE 20th Lane and NE 41st Ave., Picking Up Tree Debris on NE 19th Ave. and Mowing the Sidewalk on NE CR 225

 

Work in the NW section consists of Grading NW 41st Ave., Mowing NW 173rd St. and NW CR 229, Picking up Tree Debris on NW 219th St. and Mowing the Sidewalk on NW CR 229 and Mowing Pratt Street Pond

 

Work in the SE section consists of Grading SE 46th Loop

 

 

Work in the SW section consists of Grading SW 160th Ave., SW 155th St. and SW 136th St. and Picking up Tree Debris on SW CR 235 and SW 209th