Tentative Work Schedule

September 18, 2019

 

Work in the NW section consists of Building a parking lot at the Heilbron Springs Fire Department and Digging a ditch on NW CR 229

 

Work in the SE section consists of Grading SE 41st, SE 42nd, SE 49th to 301, SE 94th and SE 21st Ave., Patching Pot Holes on SE 17th Ave., Weed eat Vogel Pond on SE 3rd Ave., Straighten out the area where we cut up and hauled off a tree on SE CR 18 and Mowed SE CR 18 and SE CR 221 with the Zero Turns

 

Work in the SW section consists of Grading SW 66th Ave. and Mow SW CR 18 to SW CR 227

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be Weed eating SE 66th St

 

1 Squad will be Weed eating NE 14th Ave., Picking up trash and Weed eating NE 213th, NE 10th & NE 219th

 

1 Squad will be directing traffic for Digging a ditch on NW CR 229