Tentative Work Schedule

June 18, 2020

 

Work in the NE section consists of Grading NE 19th Lane, Building a Head wall on NE 227th St. and Picking up tree that is in the ditch on NE 158th 

 

Work in the NW section consists of Prepping and spraying NW 36th Ave.

 

Work in the SW section consists of Grading SW 163rd St. and Mowing SW CR 235, SW CR 231 and SW 161st

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be assisting with Building a Head Wall on NE 227th

 

1 Squad will be Picking up Trash and Weed Eating on NW 216th St. and NW CR 229A

 

1 County Officer will be assisting with Building a Head Wall on NE 227th St. (No Inmates)