Tentative Work Schedule

September 30, 2019

 

Work in the NE section consists of Grading NE 173rd St.

 

Work in the NW section consists of Grading NW 257th, NW 41st & NW 44th and Clean out the ditch on NW 41st Ave.

 

Work in the SE section consists of Grading SE 50th, SE 51st & SE 31st, Install culvert on SE 30th St., Patch Pot Holes and Troughs on SE 8th Ave. & SE CR 21B, Mow SE 109th, SE 21st Ave. and in Keystone Golf and Country Club and Build a parking lot and walk path at the Lincoln City Park,

 

Work in the SW section consists of Grading SW 66th, SW 162nd & SW 101st.

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be directing traffic and assisting with installing culverts on SE 30th St.