Tentative Work Schedule

January 24, 2022

 

Work in the NE section consists of Patching Pot Holes on NE 20th Ave. and NE 17th Ave.

 

Work in the NW section consists of Grading roads off NW CR 125 and Building a Headwall on NW 196th Way

 

Work in the SE section consists of Grading SE 50th St. and Mowing ROW on Roads off of SE 21st Ave. and SE 109th

 

Work in the SW section consists of Grading SW 66th Ave.

 

We received 1 DOC (BCSO-JAIL) Officer and 4 Inmates and will be assisting with Building a Headwall on NW 196th Way