Tentative Work Schedule

March 12, 2019

 

 Work in the NW section consists of Filling in pot holes and Grading NW 219th St., Digging the ditch on NW 53rd Ave. (Cooksy ditch), Digging the ditches on NW CR 125, Installing a culvert on NW 59th Loop, Pick up debris on NW 75th Ave, Patch driveways on NW 177th St. and Patch troughs on NW CR 225

 

Work in the SE section consists of Digging ditches on SE 44th

 

Work in the SW section consists of Grading SW 132nd

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be Picking up debris on NW 75th Ave. and Patching driveways on NW 177th St.

 

1 Squad will be Picking up trash and Weed eating on NE CR 225, NE 216th, NE 219th and NE 10th Ave

 

1 Squad will be directing traffic for digging the ditches on NW CR 125, Installing a culvert on NW 59th Loop and Digging the ditches on SE 44th