Tentative Work Schedule

April 12, 2023

 

Work in the NW section consists of Grading NW 71st Ave., NW 41st Ave, and NW 53rd Ave. and Fixing a Culvert on NW 71st Ave.

 

Work in the SE section consists of Cleaning out Ditches on SE 21st Ave. and Mulching at Keystone Airport 

 

Work in the SW section consists of Grading SW 155th Ave., SW 168th St. and SW 132nd Ave. and Mowing SW CR 225, SW CR 18 and SW 80th Pl.