Work Schedule

 

 

Work in the NE section consists of Grading

 

Work in the NW section consists of Grading, Mowing, Patching pot holes and driveways and Cutting, Trimming & Chipping

 

Work in the SE section consists of Zipping a road

 

Work in the SW section consists of Digging a ditch and Milling a road

 

 

We received 2 DOC Squads for a  total of 12 people

 

1 Squad will be assisting in Cutting, Trimming and Chipping in the NW

 

1 Squad will be assisting with traffic in the SW

 

 

1 Squad from The Transition House (3 people) will be assisting with Patching pot holes and driveways in the NW