Tentative Work Schedule

May 15, 2019

 

Work in the NE section consists of Grading and Packing NE 7th Ave.

 

Work in the NW section consists of Patching shoulder at the Union County bridge on NW CR 125, Fix driveway and Clean out pipe at 10809 NW CR 229 and Mow NW CR 225

 

Work in the SW section consists of Digging the ditch at SW CR 18 & SW CR 231 (Dedan Loop), Mowing SW CR 235 and Patching pot holes on SW CR 225A

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will be Picking up trash and weed eating NW CR 225

 

1 Squad will be directing Traffic for fixing a driveway and Cleaning out the pipe at 10809 NW R 229 then go to NW CR 125 traffic control for Patching the shoulder at the Union County bridge.

 

1 Squad will be directing Traffic for digging the ditch at SW CR 18 and SW CR 231 (Dedan Loop)