Tentative Work Schedule

May 30, 2023

 

Work in the NE section consists of Grading NE 12th Ave., NE 173rd St. and NE 171st St. and Patching Pot Holes on NE CR 225

 

Work in the SE section consists of Grading SE 86th St., Patching Pot Holes on SE 44th and SE 2nd Ave. and Hauling Asphalt to pave the road at Keystone Airport

 

Work in the SW section consists of Grading SW 66th Ave., Mowing Shoulders of the road on SW 132nd Ave., and SW 168th St. and Mowing the Sidewalk on SW CR 18 with the Zero Turn