Tentative Work Schedule

October 1, 2018

 

Work in the NE section consists of Trimming limbs on NE 15th Ave

 

Work in the NW section consists of Digging the ditch on NW 53rd Ave., Mowing NW CR 125, NW 27th, NW CR 225A and NW CR 225 and Installing a culvert on NW 37th Ave.

 

Work in the SE section consists of adding limerock and milling to SE 71st, Grading roads off of SE 21st Ave and Installing a culvert at 4620 SE 3rd Pl.

 

Work in  the SW section consists of Putting concrete bags at the bridge on SW 161st St., Grading SW 168th St. and SW 132nd and Mowing SW 161st St., SW 168th and SW 132nd Ave. with the Side Arm

 

 

We received 3 DOC Squads for a total of 21 people

 

1 Squad will be trimming limbs on NE 15th Ave.

 

1 Squad will be putting Concrete bags at the bridge on SW 161st St.

 

1 Squad will be Mowing and Weed eating Guardrails on NW CR 225A and SW CR 18